Gavin Construction - Betts Group
Home
Corporate Video
Careers
Email News
Site Map
Advanced Search
Our Company
Director's Message
History
Corporate Video
Our People
Key Personnel - Perth
Key Personnel - East Coast
Gavin Civil
Our Vision
Our Standards
QA Accreditation
OH&S Accreditation
Risk Management
Environmental Policy
Health & Safety Policy
Culture & Code of Conduct
Affiliations
Careers
Contact Us
Design & Construction
Detailed Costing
Space Planning
Feasibility Studies
Civil
Syndication
Estimate Request
Invite To Tender
Project List
Aged Care
Jacaranda Gardens
Commercial
Aussie Natural Spring Water
Betts Group
Chrystal Foods
E & MJ Rosher
Enjo Australasia Stage 1&2
Enjo Australasia Stage 3
Kearns & Riseley
Rydlyme International
Turner Engineering
Lord Street
Hanny Properties
Newcastle Street
Industrial
Antiskid Industries
Aussie Natural Spring Water
Hanny Properties
Education
Aquinas College
Soka Gakkai International
Guildford Grammar School
Cockburn Youth Centre
Health Care
Applecross Professional Dental
West Coast Surgical
Retail
E & MJ Rosher
Ikea PB
Kearns & Riseley
Multi Unit Residential
Jacaranda Gardens
Sports & Recreation
Baseball WA
Karrinyup Sports Centre
Cockburn Youth Centre
Government
Centrelink Bunbury
Centrelink Midland
Cockburn Youth Centre
Testimonials
Site Camera
Current Tenders
Tender Email List
Projects
Projects
Project List
Aged Care
Commercial
Aussie Natural Spring Water
Betts Group
Chrystal Foods
E & MJ Rosher
Enjo Australasia Stage 1&2
Enjo Australasia Stage 3
Kearns & Riseley
Rydlyme International
Turner Engineering
Lord Street
Hanny Properties
Newcastle Street
Industrial
Education
Health Care
Retail
Multi Unit Residential
Sports & Recreation
Government
Testimonials
Site Camera
You are here:
Home
>
Projects
>
Commercial
>
Betts Group
Betts Group
Project Overview
Two level office complex and distribution facility
National head office and distribution centre for the Betts Group featuring a high specification two level corporate office and state of the art warehousing facility, together with staff amenities, extensive parking and hardstand areas.
Location:
Millrose Drive, Malaga, Western
Australia
Indicative project value:
$5.2 Million
Contract source:
Referral / negotiated contract
Project Features
Prominent design feature
The predominantly open plan office was designed in close consultation with the clients to complement their organisational structure. The design incorporated features that allowed for future expansion. The use of innovative materials, such as alpolic paneling and feature slate cladding balanced against extensive tinted glass work, ensured a contemporary finish that will stand the test of time.
Significant emphasis was placed on staff comfort and amenities. The design brief called for ‘Qantas Club' standard. The lunch room has a fully functioning canteen area equipped with bay Marie’s, ovens and cappuccino machines. All bathrooms are finished with floor to ceiling tiles and high quality fixtures and fittings.
The warehouse facility is a stand alone structure that incorporates an automated pick and pack system. Extensive pallet racking and mezzanine storage has been provided for.
Construction features
Both the Office and Warehouse structures have been built using tilt panel construction. The warehouse was the first phase of the contract. This was handed over for fit-out and occupation by the client prior to the office being completed.
The ground floor slab of the warehouse was constructed with a +/- tolerance of between 2 to 3mm to accommodate the extensive pallet racking and the potential future need for specialised forklifts. Due to the extent of pallet racking, additional columns were used to reduce the tonnage and cost of roof steel.
Structural steel was selected in combination with the new King Floor system to construct the office suspended slab.
A thermal analysis was commissioned to establish heat loads and energy efficiency of the office building. Specialised tinted glass was utilized in combination with the placement of specifically rated insulation to reduce the capital outlay of the mechanical plant and equipment, along with the ongoing running costs. All mechanical plant and equipment were placed at ground level to provide easy access for maintenance.
Internal features
The internal finish of the office matches the external contemporary influence. Clean lines with modular workstations arrayed to take advantage of an open floor plan design, provide for a healthy work environment. A reflection pond is located under the main internal staircase and provides a pleasant vista across from the boardroom.
Staff comfort has also been considered with the construction of an Alfresco entertaining area adjacent to the lunch room. This is ideal for everyday use or high end corporate functions. A goods lift has been provided to cater for the extensive movement of shoes from ground floor to the buyers display rooms.
Image Gallery
© 2008 Gavin Construction |
Privacy Policy
|
Contact Us
|
Site Map
2 Birksgate Road
North Fremantle WA 6159
Tel: +61 8 9330 8000
Fax: +61 8 9330 8010
9 Buchanan Street
West End QLD 4101
Tel: +61 7 3255 3000
Fax: +61 7 3255 3006
Website by:
Equilibrium Interactive
MBA Excellence in Construction Overall Winner.
More
View our SiteCam installed at selected construction sites.
More